UL Listed Signs
Electrical assemblies built to UL standards, so your sign passes inspection and stays insurable.
See service →CNC routing, welding, acrylic, LED and finishing under one roof
Behind almost every large sign there is a structure nobody sees, and that structure decides whether it lasts. We build that, and we also take on fabrication work for other companies in the trade.
CNC routing, welding, acrylic forming, LED assembly and finishing all happen in the same shop, which is why the parts fit on the first try.
Quote this service →When one shop does the whole build, the pieces match and nobody blames a subcontractor on installation day.
Gauge and profile sized to the load and the local wind, with stamped drawings when the project calls for them.
Surface prep and coating chosen for the environment. Outdoors that is the difference between years and months.

Electrical assemblies built to UL standards, so your sign passes inspection and stays insurable.
See service →We make it easy: free quote, no strings attached, for businesses in El Paso, TX and Cd. Juárez.
Businesses in El Paso and Cd. Juárez with their sign installed and running.
The questions we get most before building a sign. If yours is not here, write to us and we will gladly answer it.
Yes. We quote free and with no strings attached. Just tell us what your business needs and where you are.
It depends on the type: a simple cabinet sign can be ready in 1 to 2 weeks; channel letters or monument signs take a bit longer. You get an exact date with your quote.
Yes. We file the sign permit with the city as part of the project, in El Paso, TX and in Cd. Juárez.
Yes. Our illuminated signs are built to UL standards, so they pass inspection and stay insurable.
Yes. We design your sign, build it in our own shop and install it with our own crew. Everything in one place.
Yes. We repair and maintain illuminated signs even if we did not build them.